F 14
6.3
Checking / adjusting the tamper de-
flector plate
Before each laying operating, check the
tamper adjustment.
The tamper knife (1) should touch the
knife bar ((2) on the screed).
The play (a) between the tamper deflec-
tor plate (3) and the tamper knife (1)
should be 0.5 mm across the entire
width.
A
If correction is necessary: See chapter E.
6.4
Cleaning the screed with high pressure cleaners
Caution! Possible damage to parts
When cleaning is performed with a high pressure cleaner,
it is possible for parts to be damaged by the jet of water:
- Do not spray bearing positions, lubricate correctly
after cleaning.
- Cover electric or electronic components, do not spray
with water.
- Do not spray parts of the gas heater (
o
), cover
these first.
Possibly dry the nozzles and filter of the gas system and
readjust the air supply.
EB51_Verstell6.bmp
3
1
a
2
NOTE
Summary of Contents for V5100TV-H
Page 2: ...www dynapac com...
Page 10: ...V 2...
Page 24: ...A 2...
Page 35: ...B 11 5 o 4 7 2 1 6 2 4 o 1 3...
Page 42: ...C 4 2 1 4 3...
Page 63: ...D 21 5 Screed heater PLC version 5 1 Switch cabinet for screed heater 40 43 44 42 41...
Page 65: ...D 23 5 2 Operating the control and monitoring unit 45 46 55 47 48 49 50 53 54 51 52...
Page 78: ...D 36 6 2 Operating the control and monitoring unit 100 101 110 102 103 104 105 108 109 106 107...
Page 94: ...D 52...
Page 100: ...E 6 Transport position 5 4 6 9 12 10 11 14 15 15 14 13...
Page 128: ...E 34 6 6 Material guide plate brace 1 2 3 3 4 6 5 7 9 8 10 11 II I 4...
Page 136: ...E 42...
Page 144: ...F 8 5 2 Guide tubes 1 1 2 2 2x 1 2...
Page 148: ...F 12 6 2 Cleaning the screed Emptying the tamper compartment 1 1 2 2 2a 1a 1a 3 4 3 4...
Page 163: ...F 27 14 2 PLC version gas heater Fuses in the switch cabinet of the screed heater A Fuses A...
Page 194: ...G 22...
Page 196: ...www dynapac com...