E 39
7.4
Basic adjustments
Prior to basic adjustment, the extendable parts must be adjusted as described in
Chapter 5.
Carry out basic adjustment as follows:
1. In the case of finishers fitted with tyres, set the correct tyre pressure.
2. Drive the paver finisher onto a level surface. The size of the area must correspond
to the total base of the paver finisher. The engine remains in operation.
3. Lower
the
screed hydraulically.
4. P-equipment: Set the lever of the switch box to the zero position.
5. Bring the screed to the floating position. (see operating instructions for the paver
finisher).
6. Set the crowning setting to zero with
the ratchet (1). The value can be
read off on the scale (2).
A
A hydraulic crowning adjuster is availa-
ble as an option.
Adjustment is carried out and displayed
in the remote control setting menu (see
paver finisher operating instructions).
7. Fully
extend
both
levelling cylinders.
1
2
Summary of Contents for V5100TV-H
Page 2: ...www dynapac com...
Page 10: ...V 2...
Page 24: ...A 2...
Page 35: ...B 11 5 o 4 7 2 1 6 2 4 o 1 3...
Page 42: ...C 4 2 1 4 3...
Page 63: ...D 21 5 Screed heater PLC version 5 1 Switch cabinet for screed heater 40 43 44 42 41...
Page 65: ...D 23 5 2 Operating the control and monitoring unit 45 46 55 47 48 49 50 53 54 51 52...
Page 78: ...D 36 6 2 Operating the control and monitoring unit 100 101 110 102 103 104 105 108 109 106 107...
Page 94: ...D 52...
Page 100: ...E 6 Transport position 5 4 6 9 12 10 11 14 15 15 14 13...
Page 128: ...E 34 6 6 Material guide plate brace 1 2 3 3 4 6 5 7 9 8 10 11 II I 4...
Page 136: ...E 42...
Page 144: ...F 8 5 2 Guide tubes 1 1 2 2 2x 1 2...
Page 148: ...F 12 6 2 Cleaning the screed Emptying the tamper compartment 1 1 2 2 2a 1a 1a 3 4 3 4...
Page 163: ...F 27 14 2 PLC version gas heater Fuses in the switch cabinet of the screed heater A Fuses A...
Page 194: ...G 22...
Page 196: ...www dynapac com...