Operation
IPL350TD-1EN2.pdf
2012-06-18
Milling
Fig. Main control panel
1. Chassis leg left
2. Chassis leg right
3. Water pump
4. Control lever 5. Speed adjustment
5
3
2
1
4
When all preparations have been completed the
milling can start while the machine is stationary:
- Lower the machine until the milling drum scrapes
lightly against the ground with the two switches
"chassis leg, right and left" (1, 2).
- Set the milling depth indicators to zero on both sides.
(see section Milling depth indicators, adjustment)
- Carefully lower the machine to required milling depth
(1, 2). The milling depth is shown on the respective
milling depth indicators.
- Set the water pump in the AUTO position (3)
- Move the machine by moving the control lever (4)
from neutral.
- If necessary, adjust to the appropriate speed (5).
The sprinkler system and automatic functions for
the conveyor belt will engage as soon as the
milling drum is in operation and the control lever
is activated.
The sprinkler system and automatic functions for
the conveyor belt will engage as soon as the
milling drum is in operation and the control lever
is activated.
5
Fig. Control panel
1. Control lever
2. Leveling 3. Chassis leg left
4. Chassis leg right
5. Milling drum drive
6. Water pump
7. Gear position switch
1
2
3
7
4
6
Stop milling
- Stop the machine and put the control lever (1) in
neutral.
- If automatic levelling has been used, swich off this
function by putting the Automatic mode switch (2) in
position 0.
- Raise the machine evenly using the switches for
chassis leg left (3) and chassis leg right (4) until the
requisite ground clearance is reached.
- Allow the milling drum drive (5) and the water pump
(6) to run for a few minutes and then switch off these
functions.
Drive away from the area:
- Set the gear position switch (7) in transport mode.
Drive the machine forward by moving the control lever
(1) slowly forward.
53
Summary of Contents for PL350 TD
Page 2: ......
Page 16: ...Safety Optional IPL350TD 1EN2 pdf 2012 06 18 8 ...
Page 20: ...Special instructions IPL350TD 1EN2 pdf 2012 06 18 12 ...
Page 66: ...Long term parking IPL350TD 1EN2 pdf 2012 06 18 58 ...
Page 72: ...Preventive maintenance IPL350TD 1EN2 pdf 2012 06 18 64 ...
Page 96: ...Maintenance 250h IPL350TD 1EN2 pdf 2012 06 18 88 ...
Page 106: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden ...
Page 107: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden ...