Operation
IPL350TD-1EN2.pdf
2012-06-18
Surface milling
Fig. Surface milling
With extended right chassis leg:
The right chassis leg goes in the already milled and
cleaned first track.
Depth setting:
- right = 0
- Left = required milling depth
With right rear foldable leg folded in:
The right rear foldable leg drives in front of the milling
drum where the ground has still not been milled.
Depth setting:
Same milling depth on right and left side.
Milling at edge of roadway or at shoulders.
Fig. Milling at edge of roadway or at
shoulders.
Depth setting:
- left - required milling depth
- right - required milling depth + shoulder height,
alternatively with planer horisontal.
The planer must always be maintained in
horisontal position when planer is in milling
position!
The planer must always be maintained in
horisontal position when planer is in milling
position!
50
Summary of Contents for PL350 TD
Page 2: ......
Page 16: ...Safety Optional IPL350TD 1EN2 pdf 2012 06 18 8 ...
Page 20: ...Special instructions IPL350TD 1EN2 pdf 2012 06 18 12 ...
Page 66: ...Long term parking IPL350TD 1EN2 pdf 2012 06 18 58 ...
Page 72: ...Preventive maintenance IPL350TD 1EN2 pdf 2012 06 18 64 ...
Page 96: ...Maintenance 250h IPL350TD 1EN2 pdf 2012 06 18 88 ...
Page 106: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden ...
Page 107: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden ...