Maintenance - 250h
IPL350TD-1EN2.pdf
2012-06-18
Slide rails - Check
Fig. 1. Slide rails, right chassis leg 1.
Slide rails 2. Retaining screws
1
2
The slide rails (4 by the right-hand chassis leg and 2
by the left-hand chassis leg) must be checked every
250 hours of operation.
When the slide rail is worn down to the screw head, it
must be replaced.
Right-hand side:
- Undo 2 retaining screws/guide rail (2).
- Replace the guide rail and install a new one with the
retaining screws.
Fig. 2. Slide rails, chassis leg, left-hand
side
1
Left-hand side:
Open the rear door on the machine to access the
guide rails by the left-hand chassis leg. The slide rails
(2) are mounted on the machine frame.
84
Summary of Contents for PL350 TD
Page 2: ......
Page 16: ...Safety Optional IPL350TD 1EN2 pdf 2012 06 18 8 ...
Page 20: ...Special instructions IPL350TD 1EN2 pdf 2012 06 18 12 ...
Page 66: ...Long term parking IPL350TD 1EN2 pdf 2012 06 18 58 ...
Page 72: ...Preventive maintenance IPL350TD 1EN2 pdf 2012 06 18 64 ...
Page 96: ...Maintenance 250h IPL350TD 1EN2 pdf 2012 06 18 88 ...
Page 106: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden ...
Page 107: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden ...