Maintenance, 10h
IPL350TD-1EN2.pdf
2012-06-18
Water tank - filling
Check the level in the water tank on the level indicator
(1) on the right-hand side of the tank.
Fig. Filling with water
1. Level indication
2. Filler cap, water
2
1
Unscrew the filler cap (2) and fill with clean water.
Only additive: A small amount of ecofriendly
antifreeze.
Only additive: A small amount of ecofriendly
antifreeze.
Sprinkler system/nozzles
Checking/Cleaning
Fig. Sprinkler nozzle
1. Nozzle
The nozzles are located on the milling drum housing.
Start the sprinkler system and make sure that no
nozzles (1) are clogged. Clean any blocked nozzles if
necessary.
Release the pipe together with the nozzles from their
attachments. Clean the nozzles with a wire brush.
Remove the nozzle if necessary for replacement or
more carefully cleaning.
When fitting new nozzles, make sure that the flat
jet of water is directed sideways towards the
milling drum.
When fitting new nozzles, make sure that the flat
jet of water is directed sideways towards the
milling drum.
74
Summary of Contents for PL350 TD
Page 2: ......
Page 16: ...Safety Optional IPL350TD 1EN2 pdf 2012 06 18 8 ...
Page 20: ...Special instructions IPL350TD 1EN2 pdf 2012 06 18 12 ...
Page 66: ...Long term parking IPL350TD 1EN2 pdf 2012 06 18 58 ...
Page 72: ...Preventive maintenance IPL350TD 1EN2 pdf 2012 06 18 64 ...
Page 96: ...Maintenance 250h IPL350TD 1EN2 pdf 2012 06 18 88 ...
Page 106: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden ...
Page 107: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden ...