Operation
IPL350TD-1EN2.pdf
2012-06-18
Instrument and lamp checks
1
Fig. Main control panel
2
3
4
Turn the switch (1) to position 1 and check that the
warning lamps for the engine (2) go on.
Check that the rotating beacon (3) and other lights (4)
are working.
Master switch - Switching on
Fig. Battery disconnector
Remember to carry out daily maintenance. Refer to
the maintenance instructions.
The battery isolator is located under the left-hand
engine cover. Turn the key to the On position. The
planer is now supplied with power.
41
Summary of Contents for PL350 TD
Page 2: ......
Page 16: ...Safety Optional IPL350TD 1EN2 pdf 2012 06 18 8 ...
Page 20: ...Special instructions IPL350TD 1EN2 pdf 2012 06 18 12 ...
Page 66: ...Long term parking IPL350TD 1EN2 pdf 2012 06 18 58 ...
Page 72: ...Preventive maintenance IPL350TD 1EN2 pdf 2012 06 18 64 ...
Page 96: ...Maintenance 250h IPL350TD 1EN2 pdf 2012 06 18 88 ...
Page 106: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden ...
Page 107: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden ...