Mounting
HyCassette-Geko
44
PR-2015-0159-GB • Subject to modifications • R1-11/2015
4.4.3 Air volume flow primary air
The air volume flow of the supplied primary air depends on the nominal volume
flow rate of the HyCassette-Geko (see Tab. 2-9on page 20) and on the pressure
drop of the primary air connection (see Fig. 4-9 and Fig. 4-10).
Fig. 4-8:
Fasten the fitting for primary air connection
1
NOTE!
To keep the air volume flow as steady as possible it is highly recommended to
use a flow rate controller in an on-site primary air duct.
Pos. 1: 1st speed stage (250 m
3
/h)
Pos. 2: 2nd speed stage (330 m
3
/h)
Pos. 3: 3rd speed stage (480 m
3
/h)
Pos. 4: 4th speed stage (660 m
3
/h)
Pos. 5: 5th speed stage (850 m
3
/h)
Fig. 4-9:
Primary air flow volume with 4-way outlet
Ext.
p
re
s
sur
e
differe
nce [Pa
]
Primary air flow volume [m³/h]
4-way