
HyCassette-Geko
Hydraulic Connection
PR-2015-0159-GB • Subject to modifications • R1-11/2015
57
Fig. 5-5: Pipe connection in a 2-pipe system
5.3.4 Medium connection in a 4-pipe system
Run non-insulated pipes and if necessary valves for inlet and outlet of chilled
water in a 4-pipe system straight above the lateral condensate pan to collect con-
densate from the pipes during cooling.
•
Please observe all instructions in Section5.3.1 "Mounting connections" on
page 56.
•
Run the pipes at a right angle to the side or upwards.
•
Screw in the connections.
•
Mount the lateral drain pan as described in "Mounting lateral condensate
pan" on page 65.
2-pipe system
Pos. 1:
Inlet line
Pos. 2:
Return line
Pos. 3:
Opening for conden-
sate hose
NOTICE!
The given dimensions are only "approximated values". Due to adding toleranc-
es there can be differences up to 10 mm (in individual cases beyond that).
NOTICE!
The pipe connections of the heat exchanger always have the internal screw
thread size R1/2".