Network Interface Board J510
The Network Interface Board J510 is an option for the J012/J013 machine only. The network board is
built into the J014.
Install the NIB
1. Check the type of machine to be installed:
• The network interface board is built into the J014, so the installation procedure described below
is not necessary for the J014.
• However, the Network Interface Board J510 is an option for the J012/J013 and must be
installed.
2. Make sure that the machine is switched off and disconnected from its power source.
3. Lift the connector cover.
4. Before you touch the network interface board, touch a metal surface to ground any static charge.
• Handle the network interface board carefully.
Options
55
1
Summary of Contents for J012
Page 1: ...Toscana C1a C1b C1bN Machine Code J012 J013 J014 SERVICE MANUAL July 2007 Subject to change ...
Page 25: ...24 ...
Page 63: ...1 Installation 62 1 ...
Page 158: ...Self Diagnostic Test Flow Self Diagnostic Test Flow 157 4 ...
Page 159: ...4 Troubleshooting 158 4 ...
Page 160: ...Self Diagnostic Test Flow 159 4 ...
Page 199: ...4 Troubleshooting 198 4 ...
Page 330: ...Basic Operation Initialization Sequence at Power On Basic Operation 329 6 ...
Page 340: ...3 Original Feed Motor 4 Pick up Roller ADF 339 6 ...
Page 341: ...6 Detailed Section Descriptions 340 6 ...
Page 364: ...MEMO 363 ...
Page 365: ...MEMO 364 ...