Installation of indoor unit
EDUS281120_a
124
RZR-P, RZQ-P(9)
3P161684-6K
12
English
Not recommendable but in case of emergency
You must use a torque wrench but if you are obliged to install the unit without a torque wrench, you may
follow the installation method mentioned below.
When you keep on tightening the flare nut with a spanner, there is a point where the tightening torque
suddenly increases. From that position, further tighten the flare nut the angle shown below:
After the work is finished, make sure to check that there is no gas leak.
•
Make absolutely sure to execute heat insulation works on the pipe-connecting section after checking gas
leakage by thoroughly studying the following figure and using the attached heat insulating materials for
fitting (8) and (9). (Fasten both ends with the clamps (4).)
(Refer to Fig. 16)
•
Wrap the sealing pad (11) only around the insulation for the joints on the gas piping side.
(Refer to Fig. 16)
CAUTION
For field insulation, be sure to insulate field piping all the way into the pipe connections inside the machine.
Exposed piping may cause condensation or burns on contact.
Pipe size
Further tightening angle
Recommended arm length of tool
φ
1/4
60 to 90 degrees
Approx. 6in.
φ
3/8
60 to 90 degrees
Approx. 8in.
φ
1/2
30 to 60 degrees
Approx. 10in.
φ
5/8
30 to 60 degrees
Approx. 12in.
Screw mounting part
of piping presser plate
(2 locations)
Liquid piping
Gas piping
Fig. 16
Gas Piping Insulation Procedure
Insulation for fitting (8)
(accessory)
Turn seams up
Turn seams up
Flare nut connection
Insulation for fitting (9)
(accessory)
Flare nut connection
Attach to base
Attach to base
Main unit
Main unit
Piping insulation
material
(Field supply)
Piping insulation
material
(Field supply)
Tighten the part other
than the piping insulation
material.
Wrap over from the
base of the unit to
the top of the flare
nut connection.
Wrap the
insulator around
the part from the
root.
Sealing pad
medium-1 (11)
(accessory)
Sealing pad
medium-2 (12)
(accessory)
Clamp (4) (accessory)
Tighten the part other
than the piping insulation
material.
Clamp (4) (accessory)
Liquid Piping Insulation Procedure
Piping insulation
material (main unit)
Piping insulation
material (main unit)
Summary of Contents for SkyAir RZQ-P Series
Page 1: ...Cooling Only 60Hz Heat Pump 60Hz RZR P RZQ P 9 series EDUS281120_a AMERICAS ...
Page 31: ...Dimensions and service space EDUS281120_a 30 RZR P RZQ P 9 BRC2A71 Unit in 3D047341 ...
Page 33: ...Dimensions and service space EDUS281120_a 32 RZR P RZQ P 9 BRC7E818 for FAQ 3D049736 Unit in ...
Page 34: ...EDUS281120_a Dimensions and service space RZR P RZQ P 9 33 BRC4C82 for FBQ 3D049611 Unit in ...
Page 38: ...EDUS281120_a Dimensions and service space RZR P RZQ P 9 37 3D064213A ...
Page 39: ...Dimensions and service space EDUS281120_a 38 RZR P RZQ P 9 3D064213A ...
Page 41: ...Dimensions and service space EDUS281120_a 40 RZR P RZQ P 9 3D047381B ...
Page 47: ...Wiring diagrams EDUS281120_a 46 RZR P RZQ P 9 FAQ18PVJU FAQ24PVJU 3D046039D ...
Page 61: ...Safety devices list EDUS281120_a 60 RZR P RZQ P 9 8 3 FAQ FAQ18PVJU FAQ24PVJU 4D047085B ...
Page 91: ...Capacity tables EDUS281120_a 90 RZR P RZQ P 9 RZR36PVJU RZR42PVJU 3D071685 ...
Page 92: ...EDUS281120_a Capacity tables RZR P RZQ P 9 91 RZQ36PVJU9 RZQ42PVJU9 C 3D047383B ...
Page 101: ...Sound Levels Reference EDUS281120_a 100 RZR P RZQ P 9 FBQ18PVJU FBQ24PVJU FBQ30PVJU FBQ36PVJU ...
Page 102: ...EDUS281120_a Sound Levels Reference RZR P RZQ P 9 101 FBQ42PVJU ...
Page 104: ...EDUS281120_a Sound Levels Reference RZR P RZQ P 9 103 RZQ42PVJU9 RZR42PVJU 4D072769 ...