![background image](http://html1.mh-extra.com/html/daikin/skyair-rzq-p-series/skyair-rzq-p-series_engineering-data_2459074211.webp)
Installation of outdoor unit
EDUS281120_a
210
RZR-P, RZQ-P(9)
3P281953-2A
English
8
(D) When outdoor units are stacked
When an obstruction is present on the air outlet
(1)
side
4
Z
40 or more
NOTE
Only two outdoor units can be stacked.
1.
About 4 in. is required as the drain piping size for the upper
2.
outdoor unit.
Close the area Z (gap between the upper outdoor unit and
3.
the lower outdoor unit) so that the outlet air does not by-
pass there.
When an obstruction is present on the air inlet side
(2)
4
Z
12 or more
NOTE
Only two outdoor units can be stacked.
1.
About 4 in. is required as the drain piping size for the upper
2.
outdoor unit.
Close the area Z (gap between the upper outdoor unit and
3.
the lower outdoor unit) so that the outlet air does not by-
pass there.
(E) When outdoor units are installed in rows (on the roof-
top, etc.)
When one outdoor unit is installed in each row
(1)
4 or more
8 or more
80 or more
40 or more
When two or more outdoor units are installed side
(2)
by side
A
L
60 or more
24 or more
120 or more
H
The dimensional relationship between H, L and A is as
shown in the table below.
L
A
L
≤
H
0
<
L
≤
1/2H
10
1/2H
<
L
≤
H
12
H
<
L
Installation is not allowed.
CAUTIONS ON INSTALLATION
5.
Before installation, confi rm the strength and levelness of the
•
foundation so that vibrations and noise are not generated.
Fix the outdoor unit securely on a rigid base with foundation
•
bolts as shown in the foundation drawing below.
(Prepare 4 sets of commercially available M12-type or
equivalent foundation bolts, nuts and washers.)
Use resin washers to prevent the paint from being scratched
•
off and rusting.
The foundation bolts should be protruded by 15/16 in.
•
(Refer to fi gure)
15/16
Resin
washer
〈〈
Drain treatment
〉〉
In a location where drain from the outdoor unit may cause
•
troubles (for example, where drainage may splash on gen-
eral passersby), perform the drain piping work using the
drain plug (optional).
For drain treatment, space of at least 4 in. is required under
•
the bottom frame of the outdoor unit.
In the drain piping work, make sure that drainage is dis-
•
charged securely.
(When routing the piping downward, check for water leak-
age.)
5 1/2
1 7/8
5 1/2
24 3/8
Air outlet side
(13 5/8-13 7/8)
13 3/4
11 3/8
8 5/8
4 5/8
Bottom view
(unit: inch)
Drain hole
16 5/8
24 1/8
Summary of Contents for SkyAir RZQ-P Series
Page 1: ...Cooling Only 60Hz Heat Pump 60Hz RZR P RZQ P 9 series EDUS281120_a AMERICAS ...
Page 31: ...Dimensions and service space EDUS281120_a 30 RZR P RZQ P 9 BRC2A71 Unit in 3D047341 ...
Page 33: ...Dimensions and service space EDUS281120_a 32 RZR P RZQ P 9 BRC7E818 for FAQ 3D049736 Unit in ...
Page 34: ...EDUS281120_a Dimensions and service space RZR P RZQ P 9 33 BRC4C82 for FBQ 3D049611 Unit in ...
Page 38: ...EDUS281120_a Dimensions and service space RZR P RZQ P 9 37 3D064213A ...
Page 39: ...Dimensions and service space EDUS281120_a 38 RZR P RZQ P 9 3D064213A ...
Page 41: ...Dimensions and service space EDUS281120_a 40 RZR P RZQ P 9 3D047381B ...
Page 47: ...Wiring diagrams EDUS281120_a 46 RZR P RZQ P 9 FAQ18PVJU FAQ24PVJU 3D046039D ...
Page 61: ...Safety devices list EDUS281120_a 60 RZR P RZQ P 9 8 3 FAQ FAQ18PVJU FAQ24PVJU 4D047085B ...
Page 91: ...Capacity tables EDUS281120_a 90 RZR P RZQ P 9 RZR36PVJU RZR42PVJU 3D071685 ...
Page 92: ...EDUS281120_a Capacity tables RZR P RZQ P 9 91 RZQ36PVJU9 RZQ42PVJU9 C 3D047383B ...
Page 101: ...Sound Levels Reference EDUS281120_a 100 RZR P RZQ P 9 FBQ18PVJU FBQ24PVJU FBQ30PVJU FBQ36PVJU ...
Page 102: ...EDUS281120_a Sound Levels Reference RZR P RZQ P 9 101 FBQ42PVJU ...
Page 104: ...EDUS281120_a Sound Levels Reference RZR P RZQ P 9 103 RZQ42PVJU9 RZR42PVJU 4D072769 ...