![background image](http://html1.mh-extra.com/html/daikin/skyair-rzq-p-series/skyair-rzq-p-series_engineering-data_2459074128.webp)
EDUS281120_a
Installation of indoor unit
RZR-P, RZQ-P(9)
127
3P161684-6K
English
15
WHEN ELECTRIC WIRING WORK IS FINISHED
•
Add approximately 1/4gal. of water slowly from the air outlet and check drainage flow.
•
Check drainage flow during COOL running, explained under ‘‘12. TEST RUN’’.
•
Refer to the figure on the following after checking the draining of water, and mount the thermal insulation
material for drainage (14) and thermal insulate the drain socket.
WHEN ELECTRIC WIRING WORK IS NOT FINISHED
CAUTION
•
Electrical wiring work should be done by a certified electrician.
•
If someone who does not have the proper qualifications performs the work, perform the following after the
test run is complete.
•
Remove the control box cover. Connect the single phase power supply (SINGLE PHASE 60Hz 208/230V)
to connections L
1
and L
2
on the terminal block for wiring the units. Connect the ground wire firmly. When
carrying out wiring work around the control box, make sure none of the connectors come undone. Be sure
to attach the control box cover before turning on the power.
•
Put approximately 1/4gal. of water into the drain pan through the blow-off mouth on the left-hand side of the
drain socket. Make sure not to pour water over the drain pump or any electric parts including those of the
drain pump.
•
When the power is turned on, the drain pump will operate and you can check the draining of water through
the transparent part of the drain socket. (The drain pump will stop automatically in 10 minutes.)
After checking the draining of water, mount the thermal insulation material for drainage (14) and thermal
insulate the drain socket.
•
After confirming drainage
(Fig. 23, Fig. 24)
, turn off the power and remove the power supply.
•
Attach the control box cover as before.
Th
erma
l
ins
ul
a
t
i
o
n
ma
t
eria
l fo
r
drainage
(14)
(
a
cc
ess
o
r
y)
Sea
l
ing
p
ad
(L
arge
) (10)
Th
erma
l
ins
ul
a
t
i
o
n
ma
t
eria
l fo
r
drainage
(14)
(
a
cc
ess
o
r
y)
Ma
k
e
s
u
re
th
a
t th
ere
is
n
o cl
earan
c
e.
B
e
s
u
re
to l
a
y th
e
sea
l
ing
ma
t
eria
l o
n
(14)
.
A
t l
eas
t
4
in.
Pl
as
t
i
c
wa
t
ering
c
an
(Tu
be
s
houl
d
be
ab
out 4
in.
lo
ng.
)
(Ch
e
ck th
e
drainage
n
o
w.
)
Ser
v
i
c
e
drain
outl
e
t (
wi
th
r
u
bber
plu
g
)
(U
se
th
is
outl
e
t to
drain
wa
t
er
f
r
o
m
th
e
drain
p
an.
)
D
rain
s
ock
e
t
s
<
Adding
wa
t
er
th
r
ou
g
h
air
dis
ch
arge
outl
e
t>
[
Me
tho
d
of
adding
wa
t
er
]
F
i
g
.
2
3
D
rain
pu
m
p
loc
a
t
i
o
n
Summary of Contents for SkyAir RZQ-P Series
Page 1: ...Cooling Only 60Hz Heat Pump 60Hz RZR P RZQ P 9 series EDUS281120_a AMERICAS ...
Page 31: ...Dimensions and service space EDUS281120_a 30 RZR P RZQ P 9 BRC2A71 Unit in 3D047341 ...
Page 33: ...Dimensions and service space EDUS281120_a 32 RZR P RZQ P 9 BRC7E818 for FAQ 3D049736 Unit in ...
Page 34: ...EDUS281120_a Dimensions and service space RZR P RZQ P 9 33 BRC4C82 for FBQ 3D049611 Unit in ...
Page 38: ...EDUS281120_a Dimensions and service space RZR P RZQ P 9 37 3D064213A ...
Page 39: ...Dimensions and service space EDUS281120_a 38 RZR P RZQ P 9 3D064213A ...
Page 41: ...Dimensions and service space EDUS281120_a 40 RZR P RZQ P 9 3D047381B ...
Page 47: ...Wiring diagrams EDUS281120_a 46 RZR P RZQ P 9 FAQ18PVJU FAQ24PVJU 3D046039D ...
Page 61: ...Safety devices list EDUS281120_a 60 RZR P RZQ P 9 8 3 FAQ FAQ18PVJU FAQ24PVJU 4D047085B ...
Page 91: ...Capacity tables EDUS281120_a 90 RZR P RZQ P 9 RZR36PVJU RZR42PVJU 3D071685 ...
Page 92: ...EDUS281120_a Capacity tables RZR P RZQ P 9 91 RZQ36PVJU9 RZQ42PVJU9 C 3D047383B ...
Page 101: ...Sound Levels Reference EDUS281120_a 100 RZR P RZQ P 9 FBQ18PVJU FBQ24PVJU FBQ30PVJU FBQ36PVJU ...
Page 102: ...EDUS281120_a Sound Levels Reference RZR P RZQ P 9 101 FBQ42PVJU ...
Page 104: ...EDUS281120_a Sound Levels Reference RZR P RZQ P 9 103 RZQ42PVJU9 RZR42PVJU 4D072769 ...