![background image](http://html1.mh-extra.com/html/daikin/skyair-rzq-p-series/skyair-rzq-p-series_engineering-data_2459074173.webp)
Installation of indoor unit
EDUS281120_a
172
RZR-P, RZQ-P(9)
3PN07521-2C
7
English
INDOOR UNIT INSTALLATION
4.
Use only accessories and parts which are of the designated specifi cation when installing.
•
CAUTION
Install so that the unit does not tilt to either side or forward.
•
Do not hold the unit by the horizontal fl aps when lifting it. (This may damage the horizontal fl aps.)
•
Open the piping through-hole.
(1)
The refrigerant pipe and drain pipe can be passed out in one of 5 directions: left, bottom-left, back-left,
•
bottom-right, and back-right.
(Refer to Fig. 3)
Using the paper pattern for installation (3), choose where to pass the piping out and open a through-
•
hole (
φ
3 1/8”) in the wall.
Open the hole so that there is a downward slope for the drain piping. (See “ 6.DRAIN PIPING WORK ”)
Remove the installation panel (1) from the unit and attach to the wall.
(2)
(The installation panel is temporarily attached to the unit with a screw. (In case of 12 type))
(Refer to Fig. 3)
(a) Check the location for the hole using the included paper pattern for installation (3).
Choose a location so that there is at least a 3 1/2” gap between the ceiling and the main unit.
•
(b) Temporarily attach the installation panel (1) at the temporary-securing position on the paper pattern for
installation (3) and use a level to make sure the drain hose is either level or tilted slightly downward.
(c) Secure the installation panel (1) to the wall using either screws or bolts.
If using the attachment screws for the installation panel (2), attach using at least 4 screws on
•
either side (for a total of 9 screws) of the recommended installation cleat position on the included
paper pattern for installation (3).
If using bolts, attach using a M8 - M10 bolt or equivalent (for a total of 2 bolts) on either side.
•
If dealing with concrete, use commercially available foundation bolts (M8 - M10 or equivalent).
•
If using the left, bottom-left, or bottom-right positions for the piping, cut out the through-hole for
(3)
the piping in the front grill
E
. (Refer to Fig. 4)
Installation panel (1)
Temporary screw
(In case of 12 type)
Left pipe
Back-left pipe
Back-ri
g
ht pipe
Bottom-left pipe
Bottom-ri
g
ht pipe
Front
g
rill
E
Cut out alon
g
the
g
roove.
Cut away
Fig. 3
Fig. 4
Summary of Contents for SkyAir RZQ-P Series
Page 1: ...Cooling Only 60Hz Heat Pump 60Hz RZR P RZQ P 9 series EDUS281120_a AMERICAS ...
Page 31: ...Dimensions and service space EDUS281120_a 30 RZR P RZQ P 9 BRC2A71 Unit in 3D047341 ...
Page 33: ...Dimensions and service space EDUS281120_a 32 RZR P RZQ P 9 BRC7E818 for FAQ 3D049736 Unit in ...
Page 34: ...EDUS281120_a Dimensions and service space RZR P RZQ P 9 33 BRC4C82 for FBQ 3D049611 Unit in ...
Page 38: ...EDUS281120_a Dimensions and service space RZR P RZQ P 9 37 3D064213A ...
Page 39: ...Dimensions and service space EDUS281120_a 38 RZR P RZQ P 9 3D064213A ...
Page 41: ...Dimensions and service space EDUS281120_a 40 RZR P RZQ P 9 3D047381B ...
Page 47: ...Wiring diagrams EDUS281120_a 46 RZR P RZQ P 9 FAQ18PVJU FAQ24PVJU 3D046039D ...
Page 61: ...Safety devices list EDUS281120_a 60 RZR P RZQ P 9 8 3 FAQ FAQ18PVJU FAQ24PVJU 4D047085B ...
Page 91: ...Capacity tables EDUS281120_a 90 RZR P RZQ P 9 RZR36PVJU RZR42PVJU 3D071685 ...
Page 92: ...EDUS281120_a Capacity tables RZR P RZQ P 9 91 RZQ36PVJU9 RZQ42PVJU9 C 3D047383B ...
Page 101: ...Sound Levels Reference EDUS281120_a 100 RZR P RZQ P 9 FBQ18PVJU FBQ24PVJU FBQ30PVJU FBQ36PVJU ...
Page 102: ...EDUS281120_a Sound Levels Reference RZR P RZQ P 9 101 FBQ42PVJU ...
Page 104: ...EDUS281120_a Sound Levels Reference RZR P RZQ P 9 103 RZQ42PVJU9 RZR42PVJU 4D072769 ...