Outdoor Unit (50 / 52 / 58 / 68 / 75 Class)
Si12-411A
244
Removal Procedure
3
Pull out the terminal
board to open.
Glass tube fuse and varistor
cannot be replaced
individually because lead-
free soldering is provided.
2. Remove each wire
harness
When reconnecting, make
sure to match the wire to the
correct connector.
1
Disconnect 4
connectors of the
electronic expansion
valve lead wires.
2
Remove the four way
valve connector
S80
.
3
Disconnect the
thermistor connector
and the overload relay
connector.
S40
:
Overload relay
S90
:
Thermistor
(Outdoor air, heat
exchanger, discharge pipe)
S92
:
Gas pipe thermistor
S93
:
Liquid pipe thermistor
Step
Procedure
Points
Connector
Electronic
expansion
valve No.
Harness
length
S20
(White)
EVA
630
S21
(Red)
EVB
730
S22
(Blue)
EVC
825
S23
(Yellow)
EVD
940
Summary of Contents for FTKE25BVM
Page 1: ...C Series Applied Models zInverter Multi Cooling Only zInverter Multi Heat Pump Si12 411A...
Page 6: ...Si12 411A Table of Contents v Index i Drawings Flow Charts v...
Page 7: ...Si12 411A vi Table of Contents...
Page 67: ...Specifications Si12 411A 56 Specifications...
Page 173: ...Instruction Si12 411A 162 System Configuration...
Page 227: ...Check Si12 411A 216 Service Diagnosis...
Page 295: ...Si12 411A iv Index...
Page 298: ...Si12 411A Printed in Singapore 03 2005 AK COS...