Si12-411A
Control Specification
Function and Control
97
3.10
Defrost Control
Outline
Heat Pump Only
Defrosting is carried out by the cooling cycle (reverse cycle). The defrosting time or outdoor
heat exchanger temperature must be more than its fixed value when finishing.
Detail
Conditions for Starting Defrost
The starting conditions must be made with the outdoor air temperature and heat exchanger
temperature. Under the conditions that the system is in heating operation, 6 minutes after the
compressor is started and more than 47 minutes of accumulated time pass since the start of the
operation or ending the defrosting.
Conditions for Canceling Defrost
The target heat exchanger temperature as the canceling condition is selected in the range of
4°C<Te<12°C according to the air temperature as the following formula.
The target heat exchanger temperature=–(45/65)×(ambient tempe14
The defrost operation surely operates in 120 seconds after the start. (A
→
B)
After then the defrost operation stops at the following conditions.
1. When the heat exchanger temperature reaches the target heat exchanger temperature.
(B
→
C)
2. When 650 seconds have passed after the start even if the heat exchanger temperature does
not reaches the target heat exchanger temperature. (C)
A
B
C
Summary of Contents for FTKE25BVM
Page 1: ...C Series Applied Models zInverter Multi Cooling Only zInverter Multi Heat Pump Si12 411A...
Page 6: ...Si12 411A Table of Contents v Index i Drawings Flow Charts v...
Page 7: ...Si12 411A vi Table of Contents...
Page 67: ...Specifications Si12 411A 56 Specifications...
Page 173: ...Instruction Si12 411A 162 System Configuration...
Page 227: ...Check Si12 411A 216 Service Diagnosis...
Page 295: ...Si12 411A iv Index...
Page 298: ...Si12 411A Printed in Singapore 03 2005 AK COS...