
Outdoor Unit (50 / 52 / 58 / 68 / 75 Class)
Si12-411A
242
Removal Procedure
2. Outdoor Unit (50 / 52 / 58 / 68 / 75 Class)
2.1
Removal of
Outer Panels
Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
1
External appearance.
2
Remove 4 screws of
the top panel and 6
screws of the front
panel.
3
Remove 4 screws of
the discharge outlet
grill.
4
Remove 2 screws of
the piping cover.
Summary of Contents for FTKE25BVM
Page 1: ...C Series Applied Models zInverter Multi Cooling Only zInverter Multi Heat Pump Si12 411A...
Page 6: ...Si12 411A Table of Contents v Index i Drawings Flow Charts v...
Page 7: ...Si12 411A vi Table of Contents...
Page 67: ...Specifications Si12 411A 56 Specifications...
Page 173: ...Instruction Si12 411A 162 System Configuration...
Page 227: ...Check Si12 411A 216 Service Diagnosis...
Page 295: ...Si12 411A iv Index...
Page 298: ...Si12 411A Printed in Singapore 03 2005 AK COS...