
Si12-411A
Outdoor Unit (80 / 90 Class)
Removal Procedure
241
Make sure there is no
refrigerant gas left inside
the refrigerant pipes
before starting the job.
Warning
The compressor's refrigerating
machine oil may catch fire. Have
wet cloth at hand for quickly putting
out the fire.
Warning
If refrigerant gas leaks during the
job, ventilate the room. (Bear in
mind that if the refrigerant gas is
exposed to open flames, noxious
gas may be generated.)
Caution
Be careful not to get yourself burnt
with the pipes and other parts that
are heated by the gas welding rod.
When heating up the
brazed parts, make sure
to carry out the N2
replacement.
5
Remove the 2 sheets of
putty.
6
Disconnect the brazed
part (a) at discharge
side of the compressor.
7
Disconnect the brazed
part (b) at suction side
of the compressor.
Step
Procedure
Points
Summary of Contents for FTKE25BVM
Page 1: ...C Series Applied Models zInverter Multi Cooling Only zInverter Multi Heat Pump Si12 411A...
Page 6: ...Si12 411A Table of Contents v Index i Drawings Flow Charts v...
Page 7: ...Si12 411A vi Table of Contents...
Page 67: ...Specifications Si12 411A 56 Specifications...
Page 173: ...Instruction Si12 411A 162 System Configuration...
Page 227: ...Check Si12 411A 216 Service Diagnosis...
Page 295: ...Si12 411A iv Index...
Page 298: ...Si12 411A Printed in Singapore 03 2005 AK COS...