
Outdoor Unit (80 / 90 Class)
Si12-411A
234
Removal Procedure
1.6
Removal of
Electronic Expansion Valve
and
Thermistor
Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
1
Remove each wire
harness.
Place the thermistor so that
its end comes up to the end
of the presser spring.
Be careful not to lose the
presser spring for the
discharge pipe thermistor.
2
Take off the putty, and
remove each
thermistor.
S90:
Outdoor air thermistor (Blue)
Heat exchanger thermistor
(Gray)
Discharge pipe thermistor
(Black)
S92: Gas pipe thermistor
Room A (Black)
Room B (Gray)
Room C (Brown)
Room D (Red)
S93: Liquid pipe thermistor
Room A (Black)
Room B (Gray)
Room C (Yellow)
Room D (Blue)
3
Remove the electronic
expansion valve coil.
Summary of Contents for FTKE25BVM
Page 1: ...C Series Applied Models zInverter Multi Cooling Only zInverter Multi Heat Pump Si12 411A...
Page 6: ...Si12 411A Table of Contents v Index i Drawings Flow Charts v...
Page 7: ...Si12 411A vi Table of Contents...
Page 67: ...Specifications Si12 411A 56 Specifications...
Page 173: ...Instruction Si12 411A 162 System Configuration...
Page 227: ...Check Si12 411A 216 Service Diagnosis...
Page 295: ...Si12 411A iv Index...
Page 298: ...Si12 411A Printed in Singapore 03 2005 AK COS...