
Si12-411A
Outdoor Unit (80 / 90 Class)
Removal Procedure
237
1.8
Removal of
Shunt
Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
1
2
Remove 6 screws of
the tie wire presser
plate.
Remove 4 screws of
the right side panel.
Fasten the rubber packing
with double-faced adhesive
tape when mounting.
3
Remove the putty.
Caution
Be careful not to get yourself
burnt with the pipes and other
parts that are heated by the gas
welding rod.
Warning
If refrigerant gas leaks during
the job, ventilate the room.
(Bear in mind that if the
refrigerant gas is exposed to
open flames, noxious gas may
be generated.)
Before taking this
procedure, make sure
there is no refrigerant gas
left in the refrigerant
pipes.
4
Disconnect the 5
brazed points of the
shunt.
Summary of Contents for FTKE25BVM
Page 1: ...C Series Applied Models zInverter Multi Cooling Only zInverter Multi Heat Pump Si12 411A...
Page 6: ...Si12 411A Table of Contents v Index i Drawings Flow Charts v...
Page 7: ...Si12 411A vi Table of Contents...
Page 67: ...Specifications Si12 411A 56 Specifications...
Page 173: ...Instruction Si12 411A 162 System Configuration...
Page 227: ...Check Si12 411A 216 Service Diagnosis...
Page 295: ...Si12 411A iv Index...
Page 298: ...Si12 411A Printed in Singapore 03 2005 AK COS...