
Instruction
Si12-411A
156
System Configuration
FLK(X) 25/35/50/60 A
Care and Cleaning
CAUTION
■
Indoor unit, Outdoor unit and Remote controller
1. Wipe them with dry soft cloth.
■
Front grille
1. Open the front grille.
• Hold the grille by the tabs on the two sides and lift
it unitl it stops.
2. Clean the front grille
• Wipe it with a soft cloth soaked in water.
• Only neutral detergent may be used.
• In case of washing the grille with water, dry it with
cloth, dry it up in the shade after washing.
3. Close the front grille
• Push the grille at the 5 points indicated by .
• Operation without air filters may result in troubles
as dust will accumulate inside the indoor unit.
CAUTION
Units
• Don’t touch the metal parts of the indoor unit. If you touch those parts, this may cause an injury.
• When opening and closing the front grille, use a robust and stable stool and watch your steps carefully.
• When opening and closing the front grille, support the grille securely with hand to prevent it from falling.
• For cleaning, do not use hot water above 40
°
C, benzine, gasoline, thinner, nor other volatile oils, pol-
ishing compound, scrubbing brushes, nor other hand stuff.
• After cleaning, make sure that the front grille is securely fixed.
Before cleaning, be sure to stop the operation and
turn the breaker OFF.
O N
OFF
O N
OFF
Summary of Contents for FTKE25BVM
Page 1: ...C Series Applied Models zInverter Multi Cooling Only zInverter Multi Heat Pump Si12 411A...
Page 6: ...Si12 411A Table of Contents v Index i Drawings Flow Charts v...
Page 7: ...Si12 411A vi Table of Contents...
Page 67: ...Specifications Si12 411A 56 Specifications...
Page 173: ...Instruction Si12 411A 162 System Configuration...
Page 227: ...Check Si12 411A 216 Service Diagnosis...
Page 295: ...Si12 411A iv Index...
Page 298: ...Si12 411A Printed in Singapore 03 2005 AK COS...