
Si12-411A
Outdoor Unit (80 / 90 Class)
Removal Procedure
227
12
Take off the thermistor
presser spring, and
remove the thermistor.
Place the thermistor so that
its end comes up to the end
of the presser spring.
Be careful not to lose the
presser spring for the
discharge pipe thermistor.
3. Removing the electrical
box
1
Remove 2 screws of
the electrical box.
2
Turn the electrical box
up side down halfway,
and disconnect the
thermistor lead wire
from the hook.
Step
Procedure
Points
Summary of Contents for FTKE25BVM
Page 1: ...C Series Applied Models zInverter Multi Cooling Only zInverter Multi Heat Pump Si12 411A...
Page 6: ...Si12 411A Table of Contents v Index i Drawings Flow Charts v...
Page 7: ...Si12 411A vi Table of Contents...
Page 67: ...Specifications Si12 411A 56 Specifications...
Page 173: ...Instruction Si12 411A 162 System Configuration...
Page 227: ...Check Si12 411A 216 Service Diagnosis...
Page 295: ...Si12 411A iv Index...
Page 298: ...Si12 411A Printed in Singapore 03 2005 AK COS...