Outdoor Unit (80 / 90 Class)
Si12-411A
222
Removal Procedure
1.3
Removal of
Electrical Box
Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
Remove the outer panels
such as top and front
panels.
Match the colors of the tie
wires to A, B, C and D ports
as follows.
(1) - Black
Power
(2) - White
Power
(3) - Red
Transmission
Wires are fixed to the
terminal board with screws.
1
The figure shows the
right side view.
1. Remove the tie wire.
1
Loosen the terminal
board screws, and
remove the wires at A
and B ports.
2
Open the terminal
board cover, and
remove the wires at C
and D ports.
When reassembling,
reconnect the wires to C and
D ports.
Summary of Contents for FTKE25BVM
Page 1: ...C Series Applied Models zInverter Multi Cooling Only zInverter Multi Heat Pump Si12 411A...
Page 6: ...Si12 411A Table of Contents v Index i Drawings Flow Charts v...
Page 7: ...Si12 411A vi Table of Contents...
Page 67: ...Specifications Si12 411A 56 Specifications...
Page 173: ...Instruction Si12 411A 162 System Configuration...
Page 227: ...Check Si12 411A 216 Service Diagnosis...
Page 295: ...Si12 411A iv Index...
Page 298: ...Si12 411A Printed in Singapore 03 2005 AK COS...