
Si12-411A
Outdoor Unit (80 / 90 Class)
Removal Procedure
229
1.4
Removal of
PCB
Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
1. Removing the controller
PCB
1
Release the tab of the
electrical box, and open
the terminal board.
2
Disconnect each
connector of the
terminal board.
3
Unscrew 1 screw and
release two tabs to
remove the PCB
Summary of Contents for FTKE25BVM
Page 1: ...C Series Applied Models zInverter Multi Cooling Only zInverter Multi Heat Pump Si12 411A...
Page 6: ...Si12 411A Table of Contents v Index i Drawings Flow Charts v...
Page 7: ...Si12 411A vi Table of Contents...
Page 67: ...Specifications Si12 411A 56 Specifications...
Page 173: ...Instruction Si12 411A 162 System Configuration...
Page 227: ...Check Si12 411A 216 Service Diagnosis...
Page 295: ...Si12 411A iv Index...
Page 298: ...Si12 411A Printed in Singapore 03 2005 AK COS...