
Si12-411A
Outdoor Unit (80 / 90 Class)
Removal Procedure
225
4
Remove the connector
S92
for gas pipe
thermistor.
5
Remove the connector
S90
for thermistor.
Outdoor air
thermistor (Blue)
Discharge pipe
thermistor (Black)
Heat exchanger
thermistor (Gray)
6
Remove the overload
relay connector
S40
.
7
Remove the reactor
lead wire.
Step
Procedure
Points
Summary of Contents for FTKE25BVM
Page 1: ...C Series Applied Models zInverter Multi Cooling Only zInverter Multi Heat Pump Si12 411A...
Page 6: ...Si12 411A Table of Contents v Index i Drawings Flow Charts v...
Page 7: ...Si12 411A vi Table of Contents...
Page 67: ...Specifications Si12 411A 56 Specifications...
Page 173: ...Instruction Si12 411A 162 System Configuration...
Page 227: ...Check Si12 411A 216 Service Diagnosis...
Page 295: ...Si12 411A iv Index...
Page 298: ...Si12 411A Printed in Singapore 03 2005 AK COS...