122
CTC GSi 600
12.11.3 Test Valves
3-way valve
HS (HS/DHW)
Function test carried out on the flow conditioner (Y21).
Test of flow to hot water or to the heating circuit.
HC = Heating Circuit
DHW = Domestic Hot Water
Menu: "Installer/Service/ Function Test/Valves".
12.11.4 Test Electric heater
Tests the electric heater per phase and step (On/Off).
Electric heater L1A
Off (Off/On)
Electric heater L1B
Off (Off/On)
Electric heater L2A
Off (Off/On)
Electric heater L2B
Off (Off/On)
Electric heater L3A
Off (Off/On)
Electric heater L3B
Off (Off/On)
Electric heater A13
Off (Off/On)
Menu: "Installer/Service/ Function Test/Electric Heater".
12.11.5 Test Heat pump
HP Compressor
Off (On/Off)
When the compressor is being function tested, the
brine and charge pump are also operating so that the
compressor does not trigger its pressure switches.
HP Brine pump/Fan
Off (Off/On)
Function test of:
• Brine pump.
• Fan (applies to air-to-water heat pumps).
HP Charge Pump
Off (Off/On/ 0...100%)
Function test charge pump 0–100%.
Menu: "Installer/Service/ Function Test/Heat Pump".
Summary of Contents for GSi 600 Series
Page 33: ...33 CTC GSi 600 B15 B12 B11 B2 G2 G2 Y2 6 1 17 Schematic diagram passive cooling alt 3 ...
Page 64: ...8 22 HP cooling module schematic diagram 3x400V A5 ...
Page 65: ...8 23 HP cooling module schematic diagram 1x230V 3x230V A5 ...
Page 67: ...M GF B25 B26 Y21 B5 G20 B24 B23 B27 B28 G11 G5 B102 B18 ...
Page 131: ...131 CTC GSi 600 ...
Page 132: ......
Page 133: ......
Page 134: ......
Page 135: ......