(C)
(G)
(F)
(A)
(E)
(E)
6:5
UGG050-0517
S Series
OPEN / CLOSE
Close the transmission
1. Read page 6:3 “General rules, Close the granulator”.
2. Read page 2:13 “Transmission”.
3. Install the plastic damper.
4. Re-assemble the transmission couplings:
S97, S910, S914, S918 slide system (option)
Information! The transmission couplings can easily be
separated / re-assembled, since the gear motor slides
on two rails. The rails are optional for S97, S910,
S914 and S918.
a) Re-assemble the couplings by pushing back the
gear motor. Align the couplings.
b) Tighten the tightening screws. Tightening torque
98 Nm.
5. Install the transmission cover.
6. The transmission is closed.
Close the granulator
6. OPEN / CLOSE
(A) = Gear motor
(B) = Eye bolt, Gear motor
(C) = Tightening screws, Gear motor (S97, S910, S914, S918)
(D) = Tightening screws, Gear motor (S918-Twin)
(E) = Transmission cover
(F) = Transmission coupling
(G) = Plastic damper