4:1
UGG050-0517
S Series
INST
ALLING
4. INSTALLING
Actions before first start
General rules, Installing
1. Read page 1:2 “Safety rules, During installing”.
2. Read all of chapter 4 before installation is started.
3. Sign the completed installation, in the end of this
chapter.
Reception inspection
1. Check the dispatch note to ensure that the delivery is
complete.
2. Check that the machine has not been damaged during
transport. Any damage must be reported to the
forwarding agent.
Put the machine in its working place
1. Refer to layout for required working space.
>Page 2:5–2:6 “Layout”.
2. Transport / lift the machine to its working area.
>Page 3:1 “Transport / Lift”.
3. Check that the machine stands horizontal and steady.
4. Lock the casters.
Remove the rust preventer
Un-painted components are treated with rust preventer
before delivery and transport. Remove the rust preventer
before operating the machine.
1. Read page 7:10 “Clean the granulator”.
2. Clean following parts inside and outside: Hopper *,
Cutter housing, Rotor, Knives, Granule bin. Use a low
aromatic alkaline degreaser or a gentle solvent. Wipe
clean with lint-free rags.
* Important! Do not use solvents or strong detergents
when cleaning a plexiglass hopper!