Smart Network Application (SNA)
Services
Cisco 350, 350X and 550X Series Managed Switches, Firmware Release 2.4, ver 0.4
527
25
Editable Parameters
You can create a power schedule (see
Setting up a Power Management Policy
) and
apply it to the devices. To perform this action, select the start time and end time of activity for
every day of the week and then select one of the following behaviors for off times.
•
PoE power inactive
•
Data inactive
•
PoE power and data inactive (default)
To properly activate the schedule on the devices, at least one port must be selected in each
device.
You can only select a behavior if at least one PoE device is selected. Otherwise, the schedule
can only be created or deleted.
The schedule created by this service uses a reserved name (orch_power_sched). Time ranges
with other names are ignored by SNA.
When applying the settings, the applied behavior is bound to all selected ports. All ports that
are not selected are unbound from the schedule if they were previously bound.
Non-PoE ports are only affected if one of the behaviors, which shut down data is selected. If a
selected port is not affected by the selected behavior, a note is added to the success message.
This note notifies the user that some ports were not bound because the selected behavior did
not apply to them.
Setting up a Power Management Policy
To set up a power management policy:
STEP 1
Select a device in the Topology view.
STEP 2
Select the
Power Management
service in the right-hand information.