Proprietary Information: Not for use or disclosure except by written agreement with Calix.
© 2001-2008 Calix. All Rights Reserved.
Chapter 7
Turning Up the Cabinet Power System
This chapter describes how to turn up and test the cabinet power system. This process
includes checking the AC power supply voltage, installing rectifier modules into the Valere
power shelf, installing batteries for reserve power, and turning up and testing the DC power
system.
Topics Covered
This chapter covers the following topics:
Checking the cabinet ground connection.
Checking the AC power supply voltage.
Installing rectifier modules into the Valere power shelf.
Installing batteries for reserve power.
Turning up and testing the DC power system.