59
Proprietary Information: Not for use or disclosure except by written agreement with Calix.
© 2001-2008 Calix. All Rights Reserved.
c.
Terminate the other end of the bond strap to the main ground bar.
4.
Secure the OSP cable to the rack or tie bars with cable ties.
5.
Remove the core wrap from around the bundled copper pairs, then install binder group
identification labels on each 25-pair group.
6.
Repeat Steps 1 through 5 for each OSP metallic cable.
7.
If splicing shall be performed at a later time, make sure cable arrangement allows the
door to close. Take care to not violate the cable bend radius requirements.