Proprietary Information: Not for use or disclosure except by written agreement with Calix.
© 2001-2008 Calix. All Rights Reserved.
Chapter 3
Preparing the Installation Site
This chapter describes how to prepare the ODC-3000 installation site for cabinet placement,
including establishing the mounting structure. Install the cabinet onto a concrete foundation
pad. You can construct a concrete pad using the Calix cast-in-place template, or you can
purchase a pre-cast concrete pad from a third-party supplier. For all mounting types, Calix
requires installation of an earth ground circuit at the installation site to provide lightning
protection.
Topics Covered
This chapter covers the following topics:
Installing a ground circuit at the installation site.
Constructing a concrete pad.
Installing a pre-cast concrete pad.