5
Proprietary Information: Not for use or disclosure except by written agreement with Calix.
© 2001-2008 Calix. All Rights Reserved.
Installing Metallic Cables ........................................................................................ 58
Installing Outside Plant Metallic Cables .......................................................... 58
Splicing Metallic Cables .................................................................................. 60
Applying T1 Labels to Protection Blocks ......................................................... 61
Installing 5-Pin Protection Modules ................................................................. 62
Sealing Cable Entry Locations ............................................................................... 63
Chapter 7: Turning Up the Cabinet Power System ............. 65
Checking the Ground Connection ......................................................................... 66
Checking the AC Power Supply Voltage ............................................................... 67
Installing Rectifier Modules into the Valere Power Shelf ..................................... 68
Installing Batteries .................................................................................................. 70
Turning Up and Testing the DC Power System .................................................... 73
Chapter 8: Installing Equipment and Adding Capacity ...... 75
Installing a C7 Expansion Shelf ............................................................................. 76
Installing a C7 Fan Tray .......................................................................................... 80
Installing a Protection Mounting Frame ................................................................ 81
Installing a Protection Block .................................................................................. 82
Installing a Battery Heater ...................................................................................... 84
Installing a Seismic Protection Kit ......................................................................... 85
Installing an AC Meter ............................................................................................. 88
Installing a Generator Connector ........................................................................... 89
Installing a Heat Exchanger Door .......................................................................... 92
Installing a Fiber Splice Tray Holder ...................................................................... 93
Installing a Fiber Distribution Panel ...................................................................... 95
Installing a Fiber Distribution Cassette Holder ..................................................... 96
Installing an xDSL Splitter Shelf ............................................................................ 98