Verification Schedule
|
141
Verification Schedule
The following schedule defines the factory-recommended
intervals for verification
tests for a washer used two to five days a week. The schedule assumes that the washer
is properly maintained as outlined in
Chapter 4
,
Preventative Maintenance.
Recommended Instrument Verification Schedule
IQ
OQ
PQ
Tests
Initially
Initially Annually Monthly
System
Self
Test
and
Checksum
Test
Evacuation Efficiency
Dispense Precision
(
without
valve module)
Dispense Precision
(
with
valve module)
Note:
Refer to page 147 to determine which tests to perform.
Important!
The risk factors associated with your assays may
require that the Operational and Performance Qualification
procedures be performed more or less frequently than shown
above.
Note:
An
instrument qualification package
(PN 7100567) for the washer
is available for purchase. The package contains thorough procedures for
performing Installation Qualification, Operational Qualification and
Performance Qualification (IQ-OQ-PQ) and preventative maintenance (PM).
Extensive Checklists and Logbooks are included for recording results. Contact
your local dealer for more information.
ELx405 Operator's Guide
Summary of Contents for ELx405
Page 2: ......
Page 4: ...ii Preface Bio Tek Instruments Inc...
Page 6: ...iv Preface Bio Tek Instruments Inc...
Page 70: ...40 Chapter 2 Installation Bio Tek Instruments Inc...
Page 168: ...138 Chapter 4 Preventive Maintenance Bio Tek Instruments Inc...
Page 200: ...170 Chapter 5 Performance Verification Qualification Tests Bio Tek Instruments Inc...
Page 214: ...184 Appendix A Troubleshooting Bio Tek Instruments Inc...
Page 250: ...220 Index Bio Tek Instruments Inc...