12
3.
SETUP PROCEDURE
3.1
INSPECTION
Carefully remove all of the protective transportation packaging and inspect the exterior of the cabinet for
any damage. Refer to the cabinet assembly diagrams.
Remove the keys from the key bag that is taped into the payout tray. Unlock and open the main door by
raising the locking lever at the side of the cabinet.
Check all the major assemblies in the main compartment to ensure that they are mounted securely.
These include:-
19” LCD Touchscreen Monitor. (Bottom Monitor)
19” LCD Monitor. (Top Monitor)
High quality industrial PC.
MPU 6
SR3e Coin mechanism
Note acceptor with stacker unit.
Universal Hopper
Compact Hopper
Power supply transformer.
Monitor Power Supply Units x2
L.E.D Driver Boards x2
Barbus Distribution Board.
Ticket Printer (When Fitted)
Card Reader (When Fitted)
Door Switches x 3 (Main, Belly Glass, Bottom Doors)
I Button ‘Dallas Technology’ Receptors Ports x 3
Check to see that all components and connectors are mounted securely and are correctly fitted. Refer to
the cabinet assembly (Internal view)
3.2
FIELD INSTALLATION
NOTE: An engineer who is responsible, competent and experienced in the safe installation of
electrical apparatus must install this equipment. At the completion of installation, the responsible
person must carry out a visual inspection of the safety critical areas and also carry out an earth
bond test between the protected earth and secondary earths. Whilst the unit is PAT tested at
the point of manufacture, it is strongly recommended that it be retested once assembled on site.
CAUTION
The handles on the rear of the cabinet are fitted to assist when
manoeuvring the machine and are not designed as a lifting aid.