83
To carryout maintenance on the Universal hopper the following steps will need to be followed.
6. Remove the payout assembly as previously described in sections 2 & 3.
7. Unscrew the top plastic diverter chute as shown in the image below.
8. Once the plastic diverter chute has been removed, proceed to remove the 8 screws that
attached the payout assembly metalwork to the Universal hopper, as shown in the image
below.
Remove the following
8 Screws