Deploying Avaya IP Office™ Platform IP500 V2
Page 59
15-601042 Issue 30j (18 May 2015)
IP Office™ Platform 9.1
Comments on this document? [email protected]
IP500 V2 Installation Overview:
3.1 Tools and Equipment Required
The following is a general summary of the tools required. Additional tools and equipment will be
required for wall and or rack mounting and to fashion ground cable connections suitable to local
requirements.
·
Tools Required
·
o
5mm Flat-blade screwdriver.
·
o
Crosshead screwdriver.
·
o
Anti-static wrist strap and ground point.
·
o
RJ45-RJ45 Ethernet LAN Cable.
·
o
M4 Cross-Head Screwdriver.
·
o
Tools suitable for crimping a cable spade.
·
o
If wall mounting, drills and tools for wall mounting fixtures.
·
Additional Parts Required
In addition to orderable IP Office equipment, the following items will be required.
·
o
14AWG Solid copper wire for ground connection of control units and expansion modules.
·
o
Cable sleeve matching local regulator requirements for ground wires. Typically green for a functional
ground and green/yellow for a protective ground.
·
o
If wall mounting, additional fixtures and fittings suitable for the wall type and mounting kit being used.
·
o
Cable ties and labels for tidying and identifying cables.
·
System Administration
1.
o
Selected method for system administration:
·
Windows PC with IP Office Admin suite installed
and RJ45 Ethernet LAN port.
2.
o
SD Card reader.
65