Service Support Spirit
Unique Solution
WWW.ARCBRO.COM
25
F1 ShapeLib
F2 Files
F3
PartOption
F4 Setups F5 Diagnose F6 ZoomIn
F7
ManualMove
F8 Zero
FLSK F2200B
Version
3.3.71.1
Speed:
00000
File:
SHAPE_43.TXT
Status:
Stop
Current Line/Hole:
00000/00000
+X:500.00 -X:0.00 +Y:500.00 -Y:0.00
1:
(
TEST PATTERN
)
2
:
G92
X
:
+000000.0
Y
:
+000000.0
Manual
【
F
】
ContiMov
StepDis
【
G
】
5.00 Flame Cu
【
M
】
CutSpeed
【
X
】
1000.00 Kerf
【
N
】
1.20
ManualSpeed
【
Y
】
3000.00 Angle 0.00
●
Ignition s
●
LowHeat s
●
HighPreheat s
●
Pierce1 s
●
Pierce2 s
●
Pierce3 s
●
TorchUp s
●
TorchDn s
●
THC En
●
Blow s
Fig. 3.5 main process interface
During the return process, the user can press the "Stop" button to stop the operation, and
can continue to return operation after pressing of
【
F3
】
. Number of back to reference and stop
has no limit.
3.7 Oxygen Gas Preheat Time Regulation
In the preheat process, press the START (F9) key to skip the process of preheat and
perforation delay, and immediately open the perforation signal then begin to cut.
In the preheat process, press the stop (F10) key to stop preheat, waiting for the F9 key is
pressed again.
In the preheat process, press the F6 key then the preheat time will be reduced to the current
preheat time spent, and skip the process of preheat and perforation delay, and open the
perforation signal then begin to cut..
For example: the original system sets the preheat time of 60 seconds, when preheat
needed, the interface will count down, under normal circumstances, till 0, the system begins the
next step of cutting, but if the system has the remaining 10 seconds of countdown time, press