4-10 | Thermox CEM O2/TM
Process Pressure
This menu option allows you to define your process pressure. It also al-
lows you to define whether your process is operating under a positive or
negative pressure. Setting this value corrects oxygen measurements for
the defined pressure.
Use this option only if you are returning the exhaust to the process. If
you are venting the exhaust to atmosphere, you do not need to enter a
process pressure.
Setting Up Process Pressure
1. Select
Process Pressure
from the Setup Key menu.
2. Select
Positive Pressure
or
Negative Pressure
.
You are then prompted to enter your system process pressure:
Pressure = xxx.x kPa
New Value?
3. Enter your process pressure (up to one decimal point is allowed - for
example, 1.5 kPa), then press the Enter Key. If you select a positive
pressure, a plus sign (+) will appear before your value. If you select a
negative pressure, a negative sign (-) will appear before your value.
The process pressure you entered will appear on the third display line.
4. If the correct pressure has been entered into the system, press the En-
ter Key without entering a new value to exit this menu option. If the
pressure was incorrectly entered, you can reenter it at this point.
NOTE
Summary of Contents for Thermox CEM O2/TM
Page 12: ...xii Thermox CEM O2 TM This page intentionally left blank...
Page 45: ...Installation 3 23 Figure 3 20 Current output connections example...
Page 47: ...Installation 3 25 Figure 3 21 Series 2000 standard alarm connections...
Page 49: ...Installation 3 27 Figure 3 22 Series 2000 controller RCU connections...
Page 51: ...Installation 3 29 Figure 3 23 Series 2000 2 wire RS 485 communications connections...
Page 53: ...Installation 3 31 Figure 3 24 Series 2000 4 wire RS 485 communications connections...
Page 56: ...3 34 Thermox CEM O2 TM This page intentionally left blank...
Page 116: ...5 26 Thermox CEM O2 TM This page intentionally left blank...
Page 137: ...Service and Parts 7 3 This page intentionally left blank...
Page 139: ...Service and Parts 7 5 Figure 7 1 Cell replacement...
Page 143: ...Service and Parts 7 9 Figure 7 3 Furnace replacement...
Page 162: ...B 4 Thermox CEM O2 TM This page intentionally left blank...
Page 166: ...C 4 Thermox CEM O2 TM This page inentionally left blank...
Page 168: ...D 2 Thermox CEM O2 TM This page intentionally left blank...