Installation
2-10
M370430-01 Rev B
Step
5
:
Performing
Functional
Tests
The functional test procedures include:
Power-on and front panel functional checks
Voltage mode operation and current mode operation checks.
For information on local operation, see “Local Operation” on page 3-1
for adjusting front panel controls and settings.
Powering the Power Supply On/Off
To power on the power supply:
1.
Ensure that the front panel power switch is in the Off position.
2.
Ensure that the AC line voltage is within operating range.
3.
Connect the line cord to a grounded AC outlet.
4.
Turn the front panel power switch to the On position.
After a short power-on delay,
illuminates on the
output voltage and current displays, followed by
.
After approximately 1 second, the display returns to normal status.
To power off the power supply:
Turn the front panel power switch to the Off position.
will blink on the display. The ALARM LED illuminates.
After a short delay, all lights on the display will not be illuminated.
Summary of Contents for Sorensen XG
Page 2: ......
Page 22: ...Contents xx M370430 01 Rev B ...
Page 96: ...Local Operation 3 48 M370430 01 Rev B Figure 3 5 Series Operation ...
Page 102: ...Local Operation 3 54 M370430 01 Rev B ...
Page 210: ...Remote Operation 5 76 M370430 01 Rev B ...
Page 276: ...Communications Options 6 66 M370430 01 Rev B ...
Page 378: ...Rack Mount Options and Installation Instructions D 12 M370430 01 Rev B ...
Page 381: ......