![Amazone Cataya 3000 Super Operating Manual Download Page 200](http://html1.mh-extra.com/html/amazone/cataya-3000-super/cataya-3000-super_operating-manual_2919712200.webp)
Use of the implement
200
Cataya Super BAH0087-11 01.19
8. Rotate the bottom flap lever (Fig. 259/1)
across the group of holes (Fig. 259/2).
Open the bottom flaps.
The metered seed flows into the collection
bucket.
9. Set the bottom flap lever in the group of
holes (Fig. 259/2), like for the last seeding
operation, as soon as the collection bucket
is full.
Fig. 259
10. Empty the collection bucket (Fig. 260/1).
11. Repeat the procedure until the seed hopper
and the seed housing are empty.
Fig. 260
12. To empty the metering wheels, like for
calibration,
turn the central key to the left
briefly run the seeding shaft drive
motor, see "ISOBUS" operating
manual.
Fig. 261
Summary of Contents for Cataya 3000 Super
Page 27: ...General safety instructions Cataya Super BAH0087 11 01 19 27 Fig 3 Fig 4 ...
Page 107: ...Layout and function Cataya Super BAH0087 11 01 19 107 Fig 119 ...
Page 247: ...Hydraulic diagram Cataya Super BAH0087 11 01 19 247 Fig 338 ...
Page 249: ...Hydraulic diagram Cataya Super BAH0087 11 01 19 249 Fig 339 ...
Page 250: ......
Page 251: ......