![Amazone Cataya 3000 Super Operating Manual Download Page 177](http://html1.mh-extra.com/html/amazone/cataya-3000-super/cataya-3000-super_operating-manual_2919712177.webp)
Settings
Cataya Super BAH0087-11 01.19
177
8.11
Moving the track marker to the working / transport position
DANGER
Secure the track markers immediately after work on the field
(transport lock).
Unsecured track markers could unintentionally move to the working
position and cause serious injury.
Only remove the transport lock for the track marker immediately
before beginning field work.
WARNING
Direct people out of the danger area.
When actuating the tractor control unit, the hydraulic cylinders of the
track marker and of the tramline marker can be actuated
simultaneously.
8.11.1
Move track marker to working position
In transport position, each track marker is
secured with a bar (Fig. 234/1).
Fig. 234
1. Position the implement on the field.
2. Unlock both track markers, see the "Soil
tillage implement" operating manual.
3. Direct people out of the swivel area of the
track marker.
4. To adjust the track discs, swing the track
markers into working position, one after the
other.
If the seed drill has the ISOBUS system,
you can swing both track markers into
working position simultaneously, see
"ISOBUS Software" operating manual.
Fig. 235
Summary of Contents for Cataya 3000 Super
Page 27: ...General safety instructions Cataya Super BAH0087 11 01 19 27 Fig 3 Fig 4 ...
Page 107: ...Layout and function Cataya Super BAH0087 11 01 19 107 Fig 119 ...
Page 247: ...Hydraulic diagram Cataya Super BAH0087 11 01 19 247 Fig 338 ...
Page 249: ...Hydraulic diagram Cataya Super BAH0087 11 01 19 249 Fig 339 ...
Page 250: ......
Page 251: ......