4601 I-V Meter Operation Manual
1.6.1 Environmental Conditions
1-12
Figure 1-6 Operating Environment
NOTE:
Warm-up Time
Allow the 4601 to warm up for at least 60 minutes after turning on the power to ensure the specified
accuracy of the 4601.
After warm-up, execute zero measurement to secure precise measurement results.
For more information, refer to Section 5.3.6, "Zero Measurement."
Vibration
Direct sunlight
Corrosive
gas
Front
• Avoid operation in these areas.
• Use a noise-cut filter when there is a large amount
of noise riding on the power line.
Dust
• Keep the rear panel more than 10 centimeters away
from the wall
Front
• Do not position the 4601 in a position with the
rear panel facing down.
Line Filter