4601 I-V Meter Operation Manual
8.4.1 Calibration Operation
8-16
Calibration procedure (6)
The following figure shows the flow of ADC3 calibration.
Connect the 4601 as shown in Figure 8-2 (e) for Ir measurement calibration, Figure 8-4 (j) for Em mea-
surement calibration, Figure 8-3 (h) for T measurement calibration, Figure 8-2 (f) for Pt measurement cal-
ibration or Figure 8-3 (g) for AD590 calibration.
Figure 8-10 Calibration Procedure (6)
NOTE: T measurement calibration requires five minutes
approximately to stabilize data after the connector
is inserted.