98 Option
Configuration of drive and bypass for MBU=0001 and MBU=0002 or MBU=0003
To harmonize the voltage level of customer interface for MCB status, MCB open and
ready status interface update from 24V to 230V which same as MCB close status. If
customer need set common point for MBU/ABU, please set X210/X310:1,3,5 as common
point. Please double-checking schematics, IO interface and the customer wiring before
commissioning due to customer interface changed. If drive still using old design, please
make sure pin3 or pin4 cannot have common grounding with pin1, pin2, pin5 and pin6.
DANGER
Three isolation switches are forbidden to be operated when MCB is
closed. Illegal operation will result in death or serious injury.The position of the
knives must be checked through the observation window after operation to
make sure they are in the right position.
Customer interface or MBU (Old)
Summary of Contents for ACS580MV
Page 1: ... ABB INDUSTRIAL DRIVES ACS580MV Commissioning Manual 200kW to 6300 kW 3 3kV to 11 kV ...
Page 4: ......
Page 8: ...8 ...
Page 43: ...Standard Commissioning Process 43 Press the button Load SW and wait till update is finished ...
Page 60: ...60 Standard Commissioning Process Complete the installation press Finish ...
Page 83: ...Standard Commissioning Process 83 ...
Page 96: ...96 Standard Commissioning Process ...
Page 121: ...Option 121 IO signals ...
Page 122: ...122 Option Panel control interface System fault ...
Page 140: ...140 Option ...
Page 148: ...148 Preventive Maintenance ...