Option 101
•
Check all three switches can fully close after ‘close switches operation’.
The movable
contacts can fully contact the stationary contacts,
below pictures show one passed case
and failed cases.
•
Check all three switches can fully open after ‘open switches operation’. The clearance
between open contacts should be bigger than
150mm
.
Check of the logic and lamp status
For lamp test, the cabinet shall be fed Auxiliary supply, and close Q7101 and Q7151. The
lamps status can be checked as below table.
Item
QS1(Q1) open
QS2(Q2) open
QS3(Q3) close
Bypass mode
QS1(Q1) open
QS2(Q2) open
QS3(Q3) open
OFF mode
QS1(Q1) close
QS2(Q2) open
QS3(Q3) open
QS1(Q1)
close
QS2(Q2)
close
QS3(Q3) open
VSD mode
Result
Aux Supply lamp
On
On
On
On
QS1(Q1)_close
lamp
Off
Off
On
On
QS1(Q1)_open
lamp
On
On
Off
Off
QS2(Q2)_close
lamp
Off
Off
Off
On
QS2(Q2)_open
lamp
On
On
On
Off
QS3(Q3)_close
lamp
On
Off
Off
Off
QS3(Q3)_open
lamp
Off
On
On
On
passed case
failed case
Summary of Contents for ACS580MV
Page 1: ... ABB INDUSTRIAL DRIVES ACS580MV Commissioning Manual 200kW to 6300 kW 3 3kV to 11 kV ...
Page 4: ......
Page 8: ...8 ...
Page 43: ...Standard Commissioning Process 43 Press the button Load SW and wait till update is finished ...
Page 60: ...60 Standard Commissioning Process Complete the installation press Finish ...
Page 83: ...Standard Commissioning Process 83 ...
Page 96: ...96 Standard Commissioning Process ...
Page 121: ...Option 121 IO signals ...
Page 122: ...122 Option Panel control interface System fault ...
Page 140: ...140 Option ...
Page 148: ...148 Preventive Maintenance ...