Standard Commissioning Process 41
•
Open Drive composer, click on System info to check version of MHDFA and
MHDAP.Check if the date and time are correct, otherwise set time.
Loading the ACS-AP-W/S assistant panel firmware
•
Remove the panel from the drive. Connect PC to the assistant control panel (ACS-AP-
W or ACS-AP-S), through the USB to mini USB cable.