Standard Commissioning Process 93
•
Complete the site condition report
‘2UBB021641_ACS580MV Drive and Site
Condition Check List’
,
together with the commissioning report (service report) and field
service report, add to the attachment.
•
Update all the drive data and reports to MoR by pressing ’Upload ALL to Installed
base (MoR)’ button.