Standard Commissioning Process 35
3. Confirm that the installation and wiring of the cooling fan is correct if the fan has been
removed by customer. When the cooling fan needs removing for some reason, just
pull off the left side plug.
Cooling Fan wiring
4. If XDI interface on BCON is used, please disconnect XDI terminals and inform
customer send instruction accordingly to confirm there is no input voltage, otherwise
X10, X90 can be damaged.
5. If XAI, XAO interfaces on BCON are used, please confirm input of XAI should be 0(2)-
10V or 0(4)-20mA, higher input can damage BCON.
BCON customer interface
Summary of Contents for ACS580MV
Page 1: ... ABB INDUSTRIAL DRIVES ACS580MV Commissioning Manual 200kW to 6300 kW 3 3kV to 11 kV ...
Page 4: ......
Page 8: ...8 ...
Page 43: ...Standard Commissioning Process 43 Press the button Load SW and wait till update is finished ...
Page 60: ...60 Standard Commissioning Process Complete the installation press Finish ...
Page 83: ...Standard Commissioning Process 83 ...
Page 96: ...96 Standard Commissioning Process ...
Page 121: ...Option 121 IO signals ...
Page 122: ...122 Option Panel control interface System fault ...
Page 140: ...140 Option ...
Page 148: ...148 Preventive Maintenance ...