68 Standard Commissioning Process
Cold commissioning
All necessary inspection
•
Inspection of converter installation.
•
Check if the power cable connection on the
secondar side of the integrated
transformer is correct.
NOTICE
The connection of power cable must be solid. It is not allowed to have any
washer between two cable lugs. The tightening torque should follow
ACS580MV
Hardware Manual
(2UBB004520).
passed case
failed case
Summary of Contents for ACS580MV
Page 1: ... ABB INDUSTRIAL DRIVES ACS580MV Commissioning Manual 200kW to 6300 kW 3 3kV to 11 kV ...
Page 4: ......
Page 8: ...8 ...
Page 43: ...Standard Commissioning Process 43 Press the button Load SW and wait till update is finished ...
Page 60: ...60 Standard Commissioning Process Complete the installation press Finish ...
Page 83: ...Standard Commissioning Process 83 ...
Page 96: ...96 Standard Commissioning Process ...
Page 121: ...Option 121 IO signals ...
Page 122: ...122 Option Panel control interface System fault ...
Page 140: ...140 Option ...
Page 148: ...148 Preventive Maintenance ...